NEW QUESTION # 17
During a third-party audit of a pharmaceutical organisation (CD9000) site of seven COVID-19 testing laboratories in various terminals at a major international airport, you interview the CD 9000's General Manager (GM), who was accompanied by Jack, the legal compliance expert. Jack is acting as the guide in the absence of the Technical Manager due to him contracting COVID-19.
You: "What external and internal issues have been identified that could affect CD9000 and its quality management system?" GM: "Jack guided us on this. We identified issues like probable competition of another laboratory organisation in the airport, legal requirements on COVID-19 continuously changing, the shortage of competent laboratory analysists, the epidemic declining soon, shortage of chemicals for the analysis. It was quite a good experience." You: "Did you document these issues?" GM: "No. Jack said that ISO 9001 does not require us to document these issues." You: "How did you determine the risks associated with the issues and did you plan actions to address them?" GM: "I am not sure. The Technical Manager is responsible for this process. Jack may be able to answer this question in his absence." Select two options for how you would respond to the General Manager's suggestion:

  • A. I would delay the audit until the return of the technical manager
  • B. I would not accept the legal compliance expert answering the question.
  • C. I would ask to audit the Technical Manager by phone.
  • D. I would ask the consultant to leave the meeting since he is not an employee of the organisation.
  • E. I would ask for a different guide instead of the legal compliance expert.
  • F. I would look for evidence that the actions resulting from the risk assessment had been taken.

Answer: B,F

Explanation:
According to clause 4.1 of ISO 9001:2015, the organization should determine external and internal issues that are relevant to its purpose and its strategic direction and that affect its ability to achieve the intended results of its quality management system. The organization should monitor and review these issues and update them as necessary. Although the standard does not explicitly require documented information of these issues, it does require documented information as evidence of the implementation of the actions taken to address risks and opportunities, as per clause 6.1. The organization should also retain documented information as evidence of the results of the monitoring, measurement, analysis and evaluation of its QMS, as per clause 9.1. Therefore, the auditor should not accept the legal compliance expert answering the question, as he is not the person responsible for the process and may not have the necessary competence or knowledge of the QMS. The auditor should also look for evidence that the actions resulting from the risk assessment had been taken, as this is a requirement of the standard and a way to verify the effectiveness of the QMS. The other options are not appropriate courses of action for the auditor, because they do not address the audit objective or criteria, or they may compromise the audit integrity or impartiality. For example, option B may not be feasible or reliable, as the Technical Manager may not be available or able to provide the necessary evidence by phone. Option C may cause unnecessary delay and inconvenience for the audit process and the auditee. Option E may not solve the problem, as the guide is not the main source of evidence or information for the audit. Option F may be disrespectful or unprofessional, as the consultant may have a legitimate role or interest in the audit.
References: ISO 9001:2015, ISO 9001 Auditing Practices Group Guidance on Context of the Organization, ISO 9001 Auditing Practices Group Guidance on Audit Evidence


NEW QUESTION # 18
Match each of the following statements into the table below to show whether they apply to first-party audits, second-party audits or third-party audits:

Answer:

Explanation:

Explanation:

Table
Statement
First-party audits
Second-party audits
Third-party audits
The audit scope is typically determined by the organisation being audited.
Yes
No
No
The outcome of the audit is typically certification to a recognised standard.
No
No
Yes
The audit scope is typically confined to service/product provision capability.
No
Yes
No
Here is a brief explanation of each statement:
The audit scope is typically determined by the organisation being audited: This statement applies to first-party audits, also known as internal audits, where the organisation audits its own processes and activities to ensure conformity and improvement1. The organisation can decide the scope of the audit based on its own needs and objectives2. This statement does not apply to second-party audits, where the customer audits the supplier, or third-party audits, where an independent body audits the organisation. In these cases, the audit scope is determined by the customer or the certification body, respectively34.
The outcome of the audit is typically certification to a recognised standard: This statement applies to third-party audits, where an independent body audits the organisation to verify that it meets the requirements of a specific standard, such as ISO 9001, and issues a certificate of conformity if the audit is successful34. This statement does not apply to first-party audits or second-party audits, where the outcome of the audit is not certification, but rather self-improvement or supplier qualification13.
The audit scope is typically confined to service/product provision capability: This statement applies to second-party audits, where the customer audits the supplier to ensure that they are meeting the requirements specified in the contract, such as service or product quality, delivery, or performance34. The audit scope is usually focused on the specific aspects of the service or product that are of interest to the customer3. This statement does not apply to first-party audits or third-party audits, where the audit scope is broader and covers the entire quality management system or the relevant clauses of the standard14.


NEW QUESTION # 19
Whistlekleen is a national dry cleaning and laundry company with 50 shops. You are conducting a surveillance audit of the Head Office and are sampling customer complaints. You find that 80% of complaints originate from five shops in the same region. Most of these complaints relate to damage to customer laundry. The Quality Manager tells you that these are the oldest shops in the company. The cleaning equipment needs replacing but the company cannot afford it at the moment. You learn that the shop managers were told to dismiss most of the claims on the basis of the poor quality of the laundered materials.
On raising the matter with senior management, you are told that there are plans to replace the equipment in these shops over the next five years.

Answer:

Explanation:

Explanation:
The quality system failed to control the laundry services provided for customers in five shops.
The equipment used was not capable of consistently producing the required service.


NEW QUESTION # 20
You work as an external quality consultant for an organisation, 'A', which provides packaged food to the public. You are asked to lead a team (you as the leader and two other auditors) to audit a supplier, 'B', to ISO
9001 which provides packaging materials to your organisation. It is 4 pm and the audit is close to an end; you are having an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting. The Closing meeting was scheduled at 5 pm.
You, as Audit Team Leader, audited top management. You explain to the audit team that you identified two nonconformities:
a. There is no documented information on Top Management Reviews, as required in clause 9.3 of ISO
9001:2015.
b. There is no evidence of Top Management Commitment as required in clause 5.1 of ISO 9001:2015. (e.g., not ensuring the availability of resources to operate the QMS, not ensuring the establishment of objectives, no promotion of improvement, no promotion of the process approach).
All agreed to present these two nonconformities. They went to meet the Top Management of 'B' and noticed that the General Manager and three other managers (Production, Human Resources, and Sales) were present in the meeting room.
Considering the seriousness of the two nonconformities to Top Management, as audit team leader, from the following select the best option:

  • A. Present the nonconformities to the managers, inform them that the report will be sent within 10 days, close the meeting and leave the site.
  • B. Present the nonconformities to the whole group and analyse with them how to overcome this situation.
  • C. Ask the General Manager to have a private conversation in which you present the nonconformities only to him because of their sensitive nature.
  • D. Present the nonconformities to the whole group and inform that you will recommend your company to remove them from the approved suppliers list.

Answer: B

Explanation:
According to the guidance on conducting the audit closing meeting1, the audit team leader should provide a summary of the audit findings and conclusions, invite discussions, and agree on timelines for any corrective actions. The audit team leader should also be respectful, constructive, and objective when presenting the nonconformities, and avoid any personal or emotional comments. The audit team leader should also consider the impact of the disruptive event (such as the Covid-19 pandemic) on the auditee's context, interested parties, and risks2, and acknowledge any good practices or improvements observed during the audit. Therefore, option D is the best option, as it follows the best practices for the closing meeting and allows the auditee to understand the nonconformities and their implications, and to participate in the analysis and resolution of the issues. Option A is not correct, as it is not respectful, constructive, or objective, and it does not invite any discussion or feedback from the auditee. It also assumes that the audit team leader has the authority to recommend the removal of the supplier from the approved list, which may not be the case. Option B is not correct, as it does not provide enough information or explanation to the auditee, and it does not allow any discussion or feedback from the auditee. It also does not follow the best practices for the closing meeting, such as providing a summary of the audit, acknowledging any good practices, and agreeing on timelines for corrective actions. Option C is not correct, as it does not involve the other managers who are responsible for the functions or processes that were audited, and who may have valuable input or information to share. It also does not follow the best practices for the closing meeting, such as providing a summary of the audit, inviting discussions, and agreeing on timelines for corrective actions. References: 1: Conducting the Audit Closing Meeting: Sharing the Results2: Auditing ISO 9001:2015 in the Context of a Disruptive Event.


NEW QUESTION # 21
An audit team leader arrives at a printing organisation to carry out a Stage 2 audit for a certification body. At a meeting with the Quality Manager, she is told that they have won their biggest contract from a computer manufacturer to print and compile computer documentation packages. They have leased the unit next door for space reasons but have never worked in this sector before. The Quality Manager wants the ISO 9001 certificate to cover the new contract.
During the audit, a team member finds that a number of print jobs have been rejected by several clients over a number of months due to spelling errors in the print run. The Print Manager blames the new employees they had to take on because of a big contract. The auditor raises a nonconformance against clause 10.2.1.b of ISO
9001.
Which one of the evidence statements would support this finding?

  • A. There was no evidence that a check of spelling took place before the release of printing to the client.
  • B. The actions taken to deal with customer complaints did not prevent recurrence of the problem.
  • C. There was no record that the organisation evaluated the effectiveness of the training given to new employees.
  • D. The organisation did not provide the correct resources to prevent nonconformity.

Answer: B

Explanation:
According to clause 10.2.1.b of ISO 9001:2015, the organization should evaluate the need for action to eliminate the causes of nonconformities, in order to prevent their recurrence. This means that the organization should identify and address the root causes and contributing factors of the nonconformities, and implement appropriate corrective actions that are effective and proportional to the impact of the nonconformities. In this case, the evidence statement that supports the finding of nonconformance is C, because it shows that the organization did not take effective actions to prevent the recurrence of the spelling errors in the print run, which resulted in repeated customer rejections and dissatisfaction. The other options are not directly related to clause 10.2.1.b, although they may indicate other nonconformities or weaknesses in the organization's QMS.
For example, option A may relate to clause 7.2 on competence, option B may relate to clause 8.6 on release of products and services, and option D may relate to clause 7.1 on resources. References: ISO 9001:2015, [ISO
9001 Auditing Practices Group Guidance on Nonconformity and Corrective Action], ISO 9001 Clause 10.
Improvement - ISO-templates.com


NEW QUESTION # 22
An internal auditor of a manufacturer of polystyrene packaging products for the electronics industry raised a nonconformity against section 10.3 of ISO 9001 in Report IA202. The nonconformity (NC 3) stated:
"The reject rate of 'finished' product of 9.7% needs improvement as it doesn't meet the stated objective of top management of 5%." Just before the Closing meeting of a third-party audit, the audit team leader is invited to a meeting with the Quality Manager. He tells the audit team leader that a member of the audit team was seen taking photographs of the factory on his phone during the day and wants him suspended from the Closing meeting with any nonconformities raised by him rescinded. The issue of photographs was not discussed during the opening meeting.
Select the three options for how the audit team leader might deal with this situation.

  • A. Apologise for the situation and ensure the Quality Manager that all photographs will be deleted during the Closing meeting
  • B. Delay the Closing meeting until the audit team leader has consulted his audit programme manager at Head Office
  • C. Advise the Quality Manager that the auditor will be reported to Head Office
  • D. Advise the Quality Manager that he, as audit team leader, needs to speak to the auditor about the situation and he will report back to the Quality Manager once this is done
  • E. State that the auditor will take no further part in the audit and all his photographs will be deleted
  • F. Insist that the nonconformities must stand since they have been agreed by the team from other evidence gathered

Answer: D,E,F

Explanation:
The audit team leader should deal with this situation in a professional and ethical manner, while maintaining the integrity and credibility of the audit process and the audit findings. The audit team leader should also try to resolve the conflict with the Quality Manager in a constructive and respectful way, without compromising the audit objectives or the audit team's independence and impartiality. According to the ISO 9001 Lead Auditor Reference Materials guides and documents, the possible actions that the audit team leader might take are:
*A. Insist that the nonconformities must stand since they have been agreed by the team from other evidence gathered. This action is consistent with the principle of evidence-based approach, which states that the audit team should collect and verify information that is appropriate, sufficient, and reliable to support the audit findings and conclusions. The audit team leader should explain to the Quality Manager that the nonconformities are not based solely on the photographs, but on other audit evidence that corroborates them.
The audit team leader should also remind the Quality Manager that the nonconformities are subject to review and approval by the certification body, and that any attempt to influence or interfere with the audit results would be considered a breach of the audit agreement and the certification rules.
*D. State that the auditor will take no further part in the audit and all his photographs will be deleted. This action is consistent with the principle of confidentiality, which states that the audit team should exercise discretion in the use and protection of information acquired during the audit. The audit team leader should acknowledge that the auditor's behavior was inappropriate and unprofessional, and that he violated the audit rules and the auditee's rights. The audit team leader should apologize for the inconvenience and the discomfort caused by the auditor, and assure the Quality Manager that the auditor will be removed from the audit team and that his photographs will be erased from his phone and any other device or media. The audit team leader should also inform the auditor of his misconduct and the consequences, and report the incident to the audit program manager and the certification body.
*F. Advise the Quality Manager that he, as audit team leader, needs to speak to the auditor about the situation and he will report back to the Quality Manager once this is done. This action is consistent with the principle of communication, which states that the audit team should exchange information with the auditee in a timely, open, honest, and respectful manner. The audit team leader should express his concern and his willingness to address the issue with the auditor, and ask for the Quality Manager's patience and cooperation. The audit team leader should also explain that the audit process is not finished yet, and that the Closing meeting is an opportunity to present and discuss the audit findings and conclusions, and to seek feedback and clarification from the auditee. The audit team leader should then speak to the auditor privately, and follow the steps described in action D.
The other options are not appropriate or effective ways to deal with this situation, because they either:
*B. Delay the Closing meeting until the audit team leader has consulted his audit program manager at Head Office. This action would disrupt the audit schedule and the audit plan, and create unnecessary delays and costs for both the audit team and the auditee. It would also show a lack of leadership and decision-making skills from the audit team leader, and undermine his authority and credibility. The audit team leader should be able to handle the situation on site, and consult his audit program manager only if the situation escalates or becomes unmanageable.
*C. Advise the Quality Manager that the auditor will be reported to Head Office. This action would escalate the conflict and create a hostile and defensive atmosphere between the audit team and the auditee. It would also imply that the audit team leader is not capable or willing to resolve the issue himself, and that he is threatening or punishing the auditee for raising a legitimate concern. The audit team leader should try to defuse the tension and restore the trust and the rapport with the Quality Manager, and report the auditor to Head Office only after the audit is completed and the audit report is submitted.
*E. Apologise for the situation and ensure the Quality Manager that all photographs will be deleted during the Closing meeting. This action would not address the root cause of the problem, and would not prevent the auditor from taking more photographs or using them for other purposes. It would also expose the audit team and the auditee to unnecessary risks and liabilities, and compromise the confidentiality and the security of the audit information. The audit team leader should delete the photographs as soon as possible, and not wait until the Closing meeting.
References: ISO 9001:2015, ISO 19011:2018, PECB Certified ISO 9001 Lead Auditor, Common Audit Problems and How to Deal with Them, The Auditor's Guide to Conflict Resolution, Conflict Resolution in your Audit Career, How to Be a Good Auditor as a Team Leader


NEW QUESTION # 23
In the context of a third-party audit, select the issue which is not expected to be included in the audit plan.

  • A. Number of sites to be audited
  • B. Risk to achieving audit objectives
  • C. Scope of the audit
  • D. Expectations of the organisation's management

Answer: D

Explanation:
According to ISO 19011:2018, clause 6.3.2, the audit plan is a document that provides the basis for agreement regarding the conduct of the audit. The audit plan should include the following information1:
*the audit objectives, scope and criteria
*the audit team members and their roles and responsibilities
*the audit schedule, including the date, time and location of each audit activity
*the expected time and duration of meetings and interviews
*the allocation of appropriate resources to critical areas of the audit
*the identification of the audit client and the auditee
*the identification of the guides and observers, if any
*the documents and records to be reviewed before and during the audit
*the audit methods and tools to be used
*the audit language and terminology
*the audit report content, format, distribution and expected completion date
*the risk to achieving audit objectives and the contingency plan, if any Therefore, the issue which is not expected to be included in the audit plan is C, expectations of the organisation's management. This issue is not relevant to the conduct of the audit, as the audit is based on the audit criteria, not on the management's expectations. The management's expectations may be considered during the audit initiation or the audit programme management, but they are not part of the audit plan.
References: ISO 19011:2018(en), Guidelines for auditing management systems, How to create an ISO 9001 internal audit plan - Advisera


NEW QUESTION # 24
Audit criteria are a set of requirements used as a reference against which objective evidence is compared.
Which two of the following are not potential audit criteria?

  • A. Commercial advertisements
  • B. Verbal agreements with interested parties
  • C. Written agreements with interested parties
  • D. ISO management system standards
  • E. Organisation's documented information
  • F. Claims made on the organisation's website
  • G. Verbal statements by the general manager
  • H. Commitment to follow principles issued by an NGO
  • I. Health and safety notices
  • J. Environmental aspects register

Answer: A,F

Explanation:
According to ISO 19011:2018, clause 3.2, audit criteria are a set of policies, procedures or requirements used as a reference against which objective evidence is compared. Audit criteria are usually selected by the audit client or by agreement between the audit client and the auditee, and they should be appropriate for the audit scope and objectives1. Audit criteria may include, but are not limited to, the following sources2:
*ISO management system standards, such as ISO 9001, ISO 14001, ISO 45001, etc.
*Verbal statements by the general manager or other top management, as long as they are consistent with the documented policies and objectives of the organisation
*Verbal agreements with interested parties, such as customers, suppliers, regulators, etc., as long as they are documented and approved by the relevant authorities
*Health and safety notices, such as posters, signs, labels, etc., that communicate the organisation's legal obligations, policies, or procedures
*Written agreements with interested parties, such as contracts, orders, specifications, etc., that define the requirements and expectations of the parties involved
*Organisation's documented information, such as policies, procedures, manuals, records, etc., that describe the organisation's management system and its processes
*Commitment to follow principles issued by an NGO, such as the United Nations Global Compact, the International Labour Organization, etc., as long as they are relevant to the organisation's context and objectives
*Environmental aspects register, such as a list of the environmental impacts and risks associated with the organisation's activities, products, and services Therefore, the two options that are not potential audit criteria are F and H, as they are not reliable or verifiable sources of information, and they may not reflect the actual performance or conformity of the organisation's management system. Commercial advertisements and claims made on the organisation's website are forms of marketing communication that may be exaggerated, misleading, or inaccurate, and they are not subject to the same level of scrutiny or approval as the other sources of audit criteria.
References: ISO 19011:2018(en), Guidelines for auditing management systems, What are audit criteria? - ISO Update


NEW QUESTION # 25
The following are stages of an audit, put them in the order they would be conducted.

Answer:

Explanation:

Explanation:
Establishing the audit programme objectives
Determining and evaluating the audit programme risks and opportunities
Establishing the audit programme
Initiating the audit
Preparing all audit activity
Conducting the audit activities
According to ISO 19011:2018, clause 5, the audit programme is a set of one or more audits planned for a specific time frame and directed towards a specific purpose. The audit programme includes all activities necessary to plan, organize, and conduct the audits. The audit programme management involves the following steps1:
Establishing the audit programme objectives: The audit programme objectives define the intended outcomes of the audit programme, such as verifying conformity, evaluating performance, identifying improvement opportunities, etc. The audit programme objectives should be aligned with the strategic direction and policies of the organization and the needs and expectations of the interested parties.
Determining and evaluating the audit programme risks and opportunities: The audit programme risks and opportunities are the factors that can affect the achievement of the audit programme objectives, such as changes in the internal or external context, availability of resources, competence of auditors, etc. The audit programme risks and opportunities should be identified, analyzed, and evaluated to determine the appropriate actions to address them.
Establishing the audit programme: The audit programme is established by defining the audit programme scope, criteria, methods, and resources. The audit programme scope defines the extent and boundaries of the audit programme, such as the processes, functions, sites, activities, etc. that will be audited. The audit programme criteria are the set of policies, procedures, or requirements used as a reference for the audits. The audit programme methods are the techniques used to conduct the audits, such as interviews, observations, document review, sampling, etc. The audit programme resources are the human, technical, and financial resources needed to implement the audit programme.
Initiating the audit: The audit initiation is the process of formally establishing the arrangements for an individual audit within the audit programme. The audit initiation involves contacting the auditee and the audit client, confirming the audit objectives, scope, and criteria, and obtaining the necessary information and access for the audit.
Preparing all audit activity: The audit preparation is the process of developing the audit plan and the audit work documents for an individual audit. The audit plan is a document that provides the basis for agreement regarding the conduct of the audit, such as the audit schedule, the audit team, the audit methods, the audit language, the audit report, etc. The audit work documents are the records that provide evidence of the audit activities, such as the audit checklist, the audit notes, the audit findings, etc.
Conducting the audit activities: The audit activities are the processes of collecting and verifying audit evidence and evaluating it against the audit criteria to make the audit conclusions. The audit activities include the opening meeting, the communication during the audit, the roles and responsibilities of the audit team and the auditee, the audit evidence collection and verification, the audit findings generation and recording, the closing meeting, and the audit report preparation and distribution.
References: ISO 19011:2018(en), Guidelines for auditing management systems


NEW QUESTION # 26
Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

  • A. Decreased number of warranty claims
  • B. Decreased number of management system nonconformities
  • C. Increased profits
  • D. Enhanced customer satisfaction
  • E. Consistently provide products that meet customers' requirements
  • F. Decreased number of nonconforming products in all stages of the manufacturing cycle

Answer: D,E

Explanation:
According to the ISO 9001:2015 document, the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015 are:
*the ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements;
*the enhancement of customer satisfaction.
These results are derived from the quality management principles of customer focus and process approach, which are the basis of the ISO 9000 family of standards1. Customer focus means understanding and meeting customer needs and expectations, as well as exceeding them when possible1. Process approach means managing activities as interrelated processes that function as a coherent system, which leads to consistent and predictable results1.
Therefore, the correct answer is C and F.
References: 2: ISO 9001:2015 - Quality management systems - Requirements 1: ISO - Quality management principles


NEW QUESTION # 27
Select one option that must be considered when determining the scope of a QMS to ISO 9001.

  • A. External issues of the organisation's context
  • B. Competence of top management
  • C. Business improvement
  • D. Performance of business processes

Answer: A

Explanation:
According to ISO 9001:2015, clause 4.3, the organization is required to determine the scope of its quality management system (QMS) by considering the external and internal issues referred to in clause 4.1. Clause 4.1 requires the organization to determine the external and internal issues that are relevant to its purpose and strategic direction, and that affect its ability to achieve the intended results of its QMS. These issues can include positive and negative factors or conditions for consideration, such as legal, technological, competitive, market, cultural, social, and economic environments, whether international, national, regional, or local. The organization is also required to monitor and review these issues.
Therefore, the correct answer is C, as external issues of the organization's context are one of the factors that must be considered when determining the scope of the QMS. The other options are either not directly related to the scope of the QMS, or are not explicitly mentioned in clause 4.3.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 4.1 and 4.3 ISO 9001:2015 - How to determine the scope of your QMS - Advisera, section "Considerations for determining the scope of the QMS in ISO 9001" ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 4


NEW QUESTION # 28
You are conducting a third-party audit to ISO 9001 and the next item on your audit plan is 'internal auditing'.
When reviewing a sample of audit records up to 5 years previously, you find that many contain non-conformance reports and no actions have been taken. You interview the Quality Manager.
You: "I have noted that many of the older files contain non-conformances that have not had any corrective action taken." Quality Manager: "Because the business is always changing, the departmental managers tell me that the non-conformances are no longer applicable. I made a decision that any non-conformance over 3 years old is automatically closed" You: "Do you obtain any confirmation beforehand from the appropriate departments that the non-conformances are no longer applicable." Quality Manager: " No, because they are so old I consider that they are no longer appropriate. Please remember that we take a risk-based approach which means we audit where and when it is considered important to do so.
Select one course of action you would now take from the options.

  • A. Interview relevant Departmental managers to assess whether the older non-conformances are still valid.
  • B. Interview Top management to determine whether they were aware of and agreed the actions of the Quality Manager
  • C. Review all non-conformances reports related to clause 9.2 of ISO 9001
  • D. Raise a non-conformance report against clause 9.2.2.e of ISO 9001

Answer: D

Explanation:
According to ISO 9001:2015, clause 9.2.2.e, the organization is required to retain documented information as evidence of the implementation of the audit programme and the audit results. This includes the records of the nonconformities identified during the internal audits and the corrective actions taken to address them. The organization is also required to verify the effectiveness of the corrective actions, as per clause 10.2.2.
Therefore, in the scenario given, the Quality Manager's decision to automatically close any nonconformance over 3 years old without obtaining any confirmation from the relevant departments or verifying the effectiveness of the corrective actions is a clear violation of the requirements of clause 9.2.2.e. This indicates a lack of control and follow-up of the internal audit process, as well as a potential risk of recurrence or occurrence of the nonconformities in other areas. This also undermines the credibility and value of the internal audit programme, as well as the risk-based approach claimed by the Quality Manager.
Hence, the best course of action to take is D, to raise a nonconformance report against clause 9.2.2.e of ISO
9001, and to communicate the audit findings to the relevant management. The other options are either insufficient or irrelevant to address the issue, as they do not directly relate to the noncompliance with clause
9.2.2.e.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 9.2.2 and 10.2.2 ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.4.4 and 6.7.2 ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 5 and 6


NEW QUESTION # 29
Which two of the following statements related to Stage 1 of an initial certification audit against ISO 9001:2015 are true?

  • A. Verifies the degrees of customer satisfaction
  • B. Evaluates the conditions of all sites
  • C. During the Stage 1 audit, the audit team:
  • D. Evaluates the results of the last management review
  • E. Reviews the client's management system documented information
  • F. Reviews the processes with high level of risk
  • G. Verifies the compliance with legal requirements

Answer: E,F

Explanation:
* Reviews the client's management system documented information: This activity involves checking the documentation of the quality management system, such as the quality policy, the quality objectives, the scope, the processes, and the procedures, to ensure that they meet the requirements of ISO 9001:2015123. The audit team also evaluates the client's understanding and implementation of the standard, and identifies any gaps or nonconformities that need to be addressed before the Stage 2 audit123.
*Reviews the processes with high level of risk: This activity involves assessing the processes that have a significant impact on the quality of the products or services, or that pose a high risk of nonconformity or customer dissatisfaction123. The audit team also verifies the client's risk management approach, and evaluates the effectiveness of the controls and actions taken to mitigate the risks123.
The other options are not statements that are true for the Stage 1 audit, according to the web search results from my internal tool. They may be related to other stages or types of audits, but they are not the focus of the Stage 1 audit.
Therefore, the correct answer is D and G.
References: 1: ISO 9001 Certification Audits | Stage 1 and Stage 2 - 9001. Simplified 2: Stage 1 of your Audit
| NQA Blog 3: Getting Certified to ISO 9001 - the Stage 1 Audit


NEW QUESTION # 30
In the context of a management system audit, identify the sequence of a typical process for collecting and verifying information. The first one has been done for you.
To complete the sequence click on the blank section you want to complete so it is highlighted in red and then click on the applicable text from the options below. Alternatively, drag and drop the options to the appropriate blank section.

Answer:

Explanation:

Explanation:
Identifying the source of information
Sampling available data
Gathering audit evidence
Verifying objective evidence
Evaluating evidence against the audit criteria
Making audit conclusions
Evaluating against the audit criteria
According to ISO 19011:2018, clause 6.4, the process of collecting and verifying information during an audit involves the following steps1:
Identifying the source of information: The audit team should identify the sources of information that are relevant to the audit objectives, scope and criteria. These sources may include documents, records, personnel, processes, activities, facilities, equipment, etc. The audit team should also determine the methods and tools for accessing and collecting the information, such as interviews, observations, document review, sampling, etc.
Sampling available data: The audit team should select a representative sample of the available data to verify the conformity and effectiveness of the management system. The sample size and selection method should be based on the audit objectives, scope and criteria, as well as the level of confidence and risk. The audit team should also consider the validity, reliability, relevance and sufficiency of the data.
Gathering audit evidence: The audit team should use the methods and tools identified in the previous step to collect audit evidence, which is the records, statements of fact or other information that are relevant to the audit criteria and verifiable. The audit team should record the audit evidence in a clear, concise and objective manner, using notes, checklists, photographs, audio or video recordings, etc.
Verifying objective evidence: The audit team should verify the accuracy, completeness and authenticity of the audit evidence collected. This may involve cross-checking different sources of information, confirming the identity and authority of the persons providing the information, examining the original documents or records, etc. The audit team should also identify any discrepancies, inconsistencies or gaps in the audit evidence.
Evaluating evidence against the audit criteria: The audit team should compare the audit evidence with the audit criteria to determine the extent of conformity and nonconformity. The audit team should also identify any opportunities for improvement, best practices, positive aspects or potential risks. The audit team should use professional judgement and apply the principles of auditing when evaluating the audit evidence.
Making audit conclusions: The audit team should consolidate the audit findings and evaluate the overall performance and effectiveness of the management system. The audit team should also consider the audit objectives, scope and criteria, as well as the context and expectations of the auditee and other interested parties. The audit team should provide a clear, concise and objective statement of the audit conclusions, which may include the degree of conformity, the achievement of the intended outcomes, the need for corrective actions, the suitability for certification, etc.
Evaluating against the audit criteria: The audit team should review the audit conclusions and ensure that they are consistent with the audit criteria and supported by sufficient and appropriate audit evidence.
The audit team should also ensure that the audit conclusions are communicated to the auditee and other relevant parties in a timely and effective manner, using the agreed audit report format and distribution method.
References: ISO 19011:2018(en), Guidelines for auditing management systems


NEW QUESTION # 31
You are carrying out an annual audit at an organisation that offers home security services. You are interviewing the Quality Manager (QM) You: "Would you tell me about your management review process?" QM: "The senior management team plans to review the management system every six months. The review follows a set agenda and records are maintained." You: "May I see the records from the last two management reviews?" Narrative: The Quality Manager gives you the latest record, which shows the last management review took place nine months ago.
The Quality Manager then gives you the previous management review record, which took place one year before the latest review.
You: "Are there any other review reports in the last two years?
QM: "No, these are the only ones."

Answer:

Explanation:

Explanation:

Nonconformity report
ISO 9001 Clause Number: 9.3.1 Nature of problem: Management review has not been conducted at the defined frequency. ISO 9001 requirement that has not been fulfilled: ISO 9001 - "Top management shall review the organization's quality management system at planned intervals." Evidence: The last management review took place nine months ago, and the previous one took place one year before the latest review. The planned interval is six months.


NEW QUESTION # 32
Select six of the activities that are specifically required by ISO 17021-1 as part third-party (Certification Body) surveillance audit processes.

  • A. Handling of customer complaints since last visit.
  • B. Failing to meet financial responsibilities.
  • C. Conduct a minimum number of annual surveillance audits during the certification period.
  • D. Confirm effectiveness of internal audit and management review.
  • E. Verify legal compliance.
  • F. Review the calibration status of the instrumentation.
  • G. Complete a full document review of the quality management system.
  • H. Review changes to the QMS since last visit.
  • I. Review the status of previously raised findings and audit effectiveness of any outstanding findings.
  • J. Audit use of certification marks on marketing materials.

Answer: A,D,E,H,I,J

Explanation:
The activities that are specifically required by ISO 17021-1 as part of third-party (Certification Body) surveillance audit processes are:
*Option A: Audit use of certification marks on marketing materials. This option is correct because ISO
17021-1:2015 clause 9.6.2.2 requires the certification body to audit the client's use of marks and/or any other reference to certification, as applicable, to ensure conformity with the certification requirements.
*Option B: Review changes to the QMS since last visit. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review any changes affecting the client's quality management system and its ability to continue to fulfil the requirements of the standard used for certification.
*Option C: Confirm effectiveness of internal audit and management review. This option is correct because ISO
17021-1:2015 clause 9.6.2.2 requires the certification body to confirm the continuing effectiveness of the client's quality management system, including the effectiveness of the internal audit and management review processes.
*Option F: Review the status of previously raised findings and audit effectiveness of any outstanding findings.
This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review the status of findings and any corrective actions taken by the client in response to previous audits, and to verify the effectiveness of the implemented corrective actions.
*Option H: Verify legal compliance. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to verify the client's compliance with applicable statutory and regulatory requirements related to the scope of certification.
*Option I: Handling of customer complaints since last visit. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review the client's handling of customer complaints related to the certified activities since the last audit.
The following options are not correct:
*Option D: Complete a full document review of the quality management system. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to complete a full document review of the quality management system during surveillance audits. A full document review is only required during the initial certification audit or when there are significant changes to the quality management system or the certification requirements.
*Option E: Failing to meet financial responsibilities. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to audit the client's financial responsibilities during surveillance audits. The certification body may have contractual arrangements with the client regarding the payment of fees, but this is not part of the surveillance audit process.
*Option G: Review the calibration status of the instrumentation. This option is not correct because ISO
17021-1:2015 clause 9.6.2.2 does not require the certification body to review the calibration status of the instrumentation during surveillance audits. The certification body may audit the client's monitoring and measuring resources as part of the quality management system requirements, but this is not a specific activity required by ISO 17021-1.
*Option J: Conduct a minimum number of annual surveillance audits during the certification period. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to conduct a minimum number of annual surveillance audits during the certification period. The certification body may determine the frequency and duration of surveillance audits based on the risk and performance of the client, but this is not a specific activity required by ISO 17021-1.
References:
*ISO 17021-1:2015 Conformity assessment - Requirements for bodies providing audit and certification of management systems - Part 1: Requirements
*ISO 9001 Lead Auditor Course Material, Module 7: Audit Follow-up and Surveillance, Slide 8: Surveillance Audit
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 7.2: Audit Follow-up and Surveillance
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 33
You work for an organisation, 'A', which provides packaged food to the public. You are asked to lead a team (you as the leader and two other auditors) to audit a supplier, 'B', which provides packaging materials to your organisation. It is 4 p.m. and the audit is close to an end; you are having an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting.
The Closing meeting was scheduled
for 5 p.m.
You, as audit team leader, audited top management, the laboratory, and the storage of raw materials.
Auditor 1 audited the two manufacturing lines and dispatch areas.
You to Auditor 1: "What findings would you report?"
Auditor 1: "When reviewing the Dispatch records, I noticed that during the morning two different trucks (Number 011 and 025) delivered the same batch number of the product (Batch 33555). Truck 011 left the plant at 9.15 am and Truck 025 left the plant at
11.30 am. Procedure P-02 Rev.3 says
that trucks should carry a complete batch. The batch number, once on the truck, is captured using a QR device." You: "OK, what do you think?" Auditor 2: "I think that this is a nonconformity." You: "OK. How would you describe the evidence on which the nonconformity will be based"?
Identify which one of the following statements best describes the identified nonconformity.

  • A. A product delivered to the client was not identified as required in P-02 Rev 3.
  • B. The batch 33555 was delivered split in two different trucks (011 and 025).
  • C. Dispatch personnel do not always carry out its activities in conformance with Procedure P-02 rev 3.
  • D. Dispatch personnel are not fully aware of the need to conform to written procedures.

Answer: B

Explanation:
According to the definition in ISO 9000, a nonconformity is "non-fulfillment of a requirement". There are three parts to a well-documented nonconformity: the audit evidence to support auditor findings; a record of the requirement against which the nonconformity is detected; and the statement of nonconformity1. In this case, the audit evidence is the dispatch records that show the same batch number of the product being delivered by two different trucks at different times. The requirement is the procedure P-02 Rev.3 that says that trucks should carry a complete batch. The statement of nonconformity is that the batch 33555 was delivered split in two different trucks (011 and 025), which does not conform to the procedure. Therefore, option C best describes the identified nonconformity, as it includes all three parts of a well-documented nonconformity.
Option A is not correct, as it does not state the audit evidence or the requirement. Option B is not correct, as it does not specify the audit evidence or the statement of nonconformity. Option D is not correct, as it does not match the audit evidence or the requirement. References: 1: ISO 9001 Auditing Practices Group Guidance on Nonconformity - Documenting.


NEW QUESTION # 34
You are carrying out an audit to ISO 9001 at an organisation which offers regulatory consultancy services to manufacturers of cosmetics.
You are interviewing the Technical Director (TD), who manages a team of regulatory experts responsible for providing regulatory services to customers.
You: "How do you ensure your regulatory team's competence concerning regulatory requirements is maintained?" TD: "The two Regulatory Experts we employ full-time have years of experience of working in the cosmetics industry." You: "How is their regulatory competence maintained?" TD: "They are dedicated individuals with lots of contacts in the sector." You: "How does the business enable them to maintain their understanding of current regulatory requirements?" TD: "We leave that up to them."

Answer:

Explanation:

Explanation:
A screenshot of a computer Description automatically generated


NEW QUESTION # 35
Below are four of the seven principles on which ISO 9000 series are based. Match a potential benefit to each of the quality management principles (QMP).

Answer:

Explanation:

Explanation:
A screenshot of a chat Description automatically generated

According to the ISO 9000:2015 document, the seven quality management principles are:
Customer focus
Leadership
Engagement of people
Process approach
Improvement
Evidence-based decision making
Relationship management
For each principle, the document provides a statement, a rationale, key benefits, and actions you can take to apply the principle in your organization.
Based on the document, here is a possible way to match a potential benefit to each of the four quality management principles you mentioned:
Table
Quality management principle
Potential benefit
Customer focus
Increased revenue and market share
Engagement of people
Enhanced trust and collaboration throughout the organization
Improvement
Enhanced drive for innovation
Evidence-based decision making
Increased ability to demonstrate effectiveness of past actions


NEW QUESTION # 36
Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

  • A. Decreased number of warranty claims
  • B. Decreased number of management system nonconformities
  • C. Increased profits
  • D. Enhanced customer satisfaction
  • E. Consistently provide products that meet customers' requirements
  • F. Decreased number of nonconforming products in all stages of the manufacturing cycle

Answer: D,E

Explanation:
The key expected results of a quality management system that conforms to the requirements of ISO 9001:2015 are stated in clause 0.1 of the standard, which says: "The adoption of a quality management system is a strategic decision for an organization that can help to improve its overall performance and provide a sound basis for sustainable development initiatives. The potential benefits to an organization of implementing a quality management system based on this International Standard are: a) the ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements; b) facilitating opportunities to enhance customer satisfaction; c) addressing risks and opportunities associated with its context and objectives; d) the ability to demonstrate conformity to specified quality management system requirements." Therefore, the two options that best match these benefits are A and E, as they directly relate to providing products and services that meet customer requirements and enhancing customer satisfaction. The other options are not explicitly mentioned as key expected results, although they may be possible outcomes of implementing a quality management system. References: ISO 9001:2015 - Quality management systems - Requirements, Key Elements of an ISO 9001:2015 Quality Management System, What is ISO 9001 2015 as a Quality Management Systems?


NEW QUESTION # 37
According to ISO 19011, what two activities take place during the conduct of a audit follow-up?

  • A. Verify corrections taken to fix the reported non-conformities
  • B. Verify legal compliance
  • C. Determine feasibility of the audit
  • D. Verify the effectiveness of the implemented corrective actions
  • E. Plan the next audit
  • F. Assign roles and responsibilities of observers

Answer: A,D

Explanation:
According to ISO 19011:2018, clause 6.7, the audit follow-up is the process of verifying the completion and effectiveness of corrective actions taken by the auditee as a result of an audit. The audit follow-up can include two main activities:
Verifying the effectiveness of the implemented corrective actions: this means checking whether the actions taken by the auditee have addressed the root causes of the nonconformities and prevented their recurrence or occurrence in other areas. The verification can be done by reviewing documents, records, data, or other evidence provided by the auditee, or by conducting a follow-up audit on site or remotely.
Verifying corrections taken to fix the reported non-conformities: this means checking whether the auditee has corrected the nonconformities identified during the audit and eliminated their immediate effects. The verification can be done by reviewing documents, records, data, or other evidence provided by the auditee, or by conducting a follow-up audit on site or remotely.
The audit follow-up can be conducted as a separate audit or as part of a subsequent audit, depending on the audit programme, the audit objectives, the audit criteria, the audit scope, the audit risks, and the audit findings.
The audit follow-up should be planned and conducted in accordance with the same principles and processes as the initial audit, and the results should be documented and reported accordingly. References:
ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.7 ISO 19011 Management Systems Audit Checklist | Process Street, task 6.7.1 and 6.7.2 Conducting the Audit Follow-Up: When to Verify - The Auditor, section "Conducting the audit follow-up"


NEW QUESTION # 38
Takitup is a small fabrication organisation that manufactures steel fencing, stairs and platforms for the construction sector. It has been certified to ISO 9001 for some time and has appointed a new Quality Manager.
The audit plan during a surveillance audit covers the organisation's improvement actions and the auditor asks to see the most recent management review meeting minutes.
The auditor finds that the management review report records that none of the improvement actions set by the previous review has been realised for a second time. A new Quality Manager has been brought in at the middle management level to rectify the situation as the organisation is concerned that it might lose its certification.
Select three options that would provide evidence of conformance with clause 10.3 of ISO 9001.

  • A. An increase in the number of quality staff.
  • B. Removing expensive external providers from the database.
  • C. Automate the fabrication process to increase profitability.
  • D. A quality objective to achieve lower reject rates by quality control.
  • E. An enhanced customer satisfaction survey score than in the previous year.
  • F. The certification body auditor reporting fewer nonconformities.
  • G. Outsource more processes to external providers
  • H. Considering results from the analysis of the effectiveness of corrective actions to determine improvement opportunities.

Answer: D,E,H


NEW QUESTION # 39
Select six tasks you would expect to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit.

  • A. Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members.
  • B. Re-audit corrective actions taken to correct findings found during the audit.
  • C. Audit team complete final version of their individual findings.
  • D. Write the audit finding report out when detected and obtain signature of the auditee.
  • E. Audit team review any points raised by the auditee nominated representative.
  • F. Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held.
  • G. Final audit team meeting to agree findings and categories including clarification of any uncertainties.
  • H. Audit team agree final audit outcome recommendation.
  • I. Agree the roles of each audit team member for the closing meeting.
  • J. Audit team leader completes final report, including individual findings and certification recommendation.

Answer: B,C,E,G,H,I

Explanation:
The tasks that are expected to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit are:
*Option C: Final audit team meeting to agree findings and categories including clarification of any uncertainties. This option is correct because the audit team meeting is an opportunity for the audit team leader and the audit team members to review and consolidate the audit findings, to ensure that they are clear, accurate, objective, and supported by sufficient audit evidence. The audit team should also agree on the categories of the findings, such as nonconformity, observation, or opportunity for improvement, and resolve any uncertainties or disagreements among the audit team members.
*Option D: Agree the roles of each audit team member for the closing meeting. This option is correct because the audit team meeting is an opportunity for the audit team leader to assign the roles and responsibilities of each audit team member for the closing meeting, such as presenting the audit findings, answering questions, or taking notes. The audit team leader should also ensure that the audit team members are prepared and confident to perform their roles and to communicate effectively with the auditee.
*Option E: Audit team review any points raised by the auditee nominated representative. This option is correct because the audit team meeting is an opportunity for the audit team to review any points raised by the auditee nominated representative during the audit, such as requests for clarification, feedback, or complaints. The audit team should consider the validity and relevance of the points raised and decide how to address them in the closing meeting or in the audit report.
*Option F: Audit team agree final audit outcome recommendation. This option is correct because the audit team meeting is an opportunity for the audit team to agree on the final audit outcome recommendation, based on the audit findings and the audit criteria. The audit team should also consider the implications and consequences of the audit outcome recommendation for the auditee and the certification body, and ensure that the recommendation is consistent and justified.
*Option H: Audit team complete final version of their individual findings. This option is correct because the audit team meeting is an opportunity for the audit team to complete the final version of their individual findings, based on the agreement and feedback from the audit team meeting. The audit team should ensure that their individual findings are written in a clear, concise, and factual manner, and that they include the audit criteria, the audit evidence, and the audit conclusion. The audit team should also submit their individual findings to the audit team leader for review and approval.
*Option I: Re-audit corrective actions taken to correct findings found during the audit. This option is correct because the audit team meeting is an opportunity for the audit team to re-audit the corrective actions taken by the auditee to correct the findings found during the audit, if applicable and feasible. The audit team should verify the effectiveness and adequacy of the corrective actions and update the audit findings accordingly. The audit team should also document the results of the re-audit and communicate them to the auditee.
The following options are not correct:
*Option A: Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held. This option is not correct because this task is not part of the audit team meeting, but part of the communication between the audit team leader and the individual(s) managing the audit programme. The audit team leader should inform the individual(s) managing the audit programme that the closing meeting is ready to be held after the audit team meeting, when the audit team has completed all the tasks and is ready to present the audit results to the auditee.
*Option B: Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members. This option is not correct because this task is not part of the final audit team meeting, but part of the daily audit team meetings that are held during the audit. The daily audit team meetings are opportunities for the audit team to review the progress and performance of the audit, to identify and resolve any issues or problems, and to coordinate and adjust the audit plan and activities as needed.
*Option G: Audit team leader completes final report, including individual findings and certification recommendation. This option is not correct because this task is not part of the audit team meeting, but part of the audit reporting process. The audit team leader should complete the final report, including the individual findings and the certification recommendation, after the closing meeting, when the audit team has received and considered the feedback and comments from the auditee. The audit team leader should also ensure that the final report is reviewed and approved by the appropriate authorities before issuing it to the auditee and the certification body.
*Option J: Write the audit finding report out when detected and obtain signature of the auditee. This option is not correct because this task is not part of the audit team meeting, but part of the audit evidence collection and documentation process. The audit team should write the audit finding report out when detected and obtain the signature of the auditee during the audit, when the audit team has observed and verified the audit evidence and has communicated the audit finding to the auditee. The signature of the auditee does not indicate acceptance or agreement with the audit finding, but only acknowledgement of receipt.
References:
*ISO 19011:2018 Guidelines for auditing management systems, Clause 6.4.2: Conducting audit activities, Subclause i) and j)
*ISO 9001 Lead Auditor Course Material, Module 5: Conducting an Audit, Slide 19: Audit Team Meeting
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 5.4: Audit Team Meeting
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 40
You are conducting an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organisation manufactures cosmetics for major retailers and the name of the retailer supplied appears on the product packaging. Sales turnover has increased significantly over the past five years You are interviewing the new Product Development Manager. You note that a software application called SWIFT is used to help control the product development process.
You have gathered audit evidence as outlined in the table. Match the ISO 9001 clause 8.3 extracts to the audit evidence.

Answer:

Explanation:

Explanation:

The table below shows the possible matching of the ISO 9001 Clause 8.3 extract to the audit evidence.
Table
Audit evidence
ISO 9001 Clause 8.3 extract
Half of all new products launched in the past 12 months were late. The NPD Manager explains he has not got enough people on his team to cope with the demand for new products.
"8.3.2 e) ... internal ... resource needs for the design and development of products ..." The NPD Manager explains many changes are made to cosmetic formulations during product development owing to retailer feedback. Only when confirmed by the retailer is the agreed formulation documented on SWIFT.
"8.3.5 ... retain documented information ..."
The NPD Manager explains that the customer confirms their approval to proceed with a new formulation by email. These emails are kept on SWIFT.
"8.3.6 ... retain documented information ..."
The NPD Manager shows you evidence of consumer trials that are carried out for some new products prior to full-scale launch.
"8.3.4 d) ... conducted to ensure that the resulting products and services meet the requirements ..." The NPD Manager explains that an approved external laboratory is used to perform shelf-life stability trials on some formulations during product development.
"8.3.2 e) ... external ... resource needs for the design and development of products ..."


NEW QUESTION # 41
An audit team leader arrives at a printing company to carry out a Stage 2 audit for a certification body. At a meeting with the Quality Manager, she is told that they have won their biggest contract from a computer manufacturer to print and compile computer documentation packages. The Quality Manager wants the ISO
9001 certificate to cover the new contract.
During the audit, a team member found that some print jobs had been rejected by several clients over some months due to spelling errors in the print run. The Print Manager blames the new employees they had to take on because of a big contract.
The auditor finds that the responsibility for checking spelling errors is placed on the printer that sets up the print run.
In line with the policy of the certification body, the audit team raise improvement opportunities in the audit report. Which three of the following options would represent acceptable opportunities for improvement in the report?

  • A. Operational planning activities may benefit from a clearer risk-based approach.
  • B. A business consultant can be recommended for advice on improving operations.
  • C. The responsibility for checking printing needs to be independent of the operators.
  • D. A plan to determine why the errors occur and to prevent them.
  • E. More process time needs to be allocated to the new employees.
  • F. An intensive training plan that involves all production personnel.
  • G. The recruitment process to include spelling tests to filter out unsuitable candidates.
  • H. The organisation needs to delay its certification to gain more experience of the QMS.

Answer: A,C,D

Explanation:
According to the ISO 9001 Auditing Practices Group Guidance on Improvement Opportunities1, an improvement opportunity is a suggestion made by the auditor for the auditee to consider that, if implemented, may enhance the performance of the QMS. Improvement opportunities are not mandatory, but they should be based on objective evidence and aligned with the audit criteria and objectives. Improvement opportunities should also be realistic, feasible, and beneficial for the auditee. In this case, the evidence statements that represent acceptable improvement opportunities in the report are A, C, and E, because they address the potential causes and effects of the spelling errors in the print run, and propose possible actions that may improve the quality of the products and services, and the effectiveness of the QMS. These options are consistent with the requirements and principles of ISO 9001, such as clause 6.1 on actions to address risks and opportunities, clause 8.1 on operational planning and control, clause 8.5.1 on control of production and service provision, and clause 10.2 on nonconformity and corrective action. The other options are not appropriate improvement opportunities, because they are either irrelevant, unrealistic, or unhelpful for the auditee. For example, option B may contradict the audit objective and scope, option D may imply a lack of auditor competence or impartiality, option F may not address the root cause of the problem, option G may not be applicable or effective, and option H may not be feasible or justified. References: ISO 9001 Auditing Practices Group Guidance on Improvement Opportunities, ISO 9001:2015, ISO 9001 Auditing Practices Group Guidance on Audit Evidence